title: Enka WallDrain/3D WallDrain Installation Instructions
description: Enka®WallDrain and 3D WallDrain Installation of  Walldrain Ventilation Mats. A guide of generally accepted procedures for a successful installation.
---

- [Privacy Notice](https://www.globalplasticsheeting.com/privacy-notice?hsLang=en-us) |
- [Shipping & Returns](https://www.globalplasticsheeting.com/shipping-and-returns?hsLang=en-us)

 

<https://www.globalplasticsheeting.com/?hsLang=en-us>

[![Global Plastic Sheeting, Plastic Sheeting Specialist](https://www.globalplasticsheeting.com/hs-fs/file-2336161311-png/images/logo-mobile.png)](https://www.globalplasticsheeting.com/?hsLang=en-us)

![side_img37](https://www.globalplasticsheeting.com/hs-fs/file-2350449328-png/images/side_img37.png)

![side_img37](https://www.globalplasticsheeting.com/hs-fs/file-2350449328-png/images/side_img37.png)

Click to call from your cell: [+17605979298](tel:+17605979298)

# Enka WallDrain and 3D WallDrain Installation Instructionsions

## WallDrain Ventilation Mats

### Materials:

**Enka®WallDrain D 6P1 Plus *  Enka®WallDrain D 6P1 * Enka®WallDrain D 10P1 Plus * Enka®WallDrain W 10P1 * 3DWallDrain P 10P1 Plus * 3DWallDrain P 10P1 * ****Cap Screws *  Staples * Roofing Nails **

 

**Tools:**

 Measuring Tape  
 Utility Knife or Scissors  
 Hammer Tacker, Nail Gun, or Drill

 

**General Notes:**

 

1. These suggestions are a guide of generally accepted procedures for successful installation.  
It may be followed, modified, or rejected by the contractor and/or design profession  
of record or their representative since they, not Low & Bonar Inc., are responsible for  
designing, planning and executing procedures appropriate to a specific application.  
2. Consult local building codes and regulations prior to installation  
3. Ensure that the substrate is sound and that there are no voids or other protrusions or conditions that would interfere with the systems performance.  
4. Building paper or WRB should be installed with windows and doors properly flashed  
and sealed according to manufacturer’s guidelines. For additional guidance refer to  
ASTM E2112-07 Standard Practice for Installation of Exterior Windows, Doors and Skylights  
& AAMA 2400-02 (Formerly CAWM 400-95) Standard Practice for Installation of Windows  
with a Mounting Flange in Stud Frame Construction.  
5. Exterior finish materials should be installed according to manufacturer’s installation  
guidelines.  
6. Cover rainscreen as soon as possible as it is not designed for continuous UV exposure.  
7. A ventilation detail should be installed every 2 levels if structure is more than two stories.  
8. In high rainfall zones a ventilation detail should be included at each level.

 

## **Enka WallDrain Stucco Wall Installation**

![Enka WallDrain/3D WallDrain](https://www.globalplasticsheeting.com/hs-fs/hubfs/Enka%20WallDrain%203D%20WallDrain-jpg.jpeg?width=200&height=205&name=Enka%20WallDrain%203D%20WallDrain-jpg.jpeg)

 

 

1. Begin placing **Enka WallDrain** at the bottom of the wall with the fabric flap  
down. Unroll WallDrain horizontally with entangled filaments touching the  
Building Paper/WRB with the filter fabric to the outside.  
2. The bottom edge of the WallDrain core should be aligned with the top  
of the weep screed. Weep screed should installed according to manufacturer’s guidelines.  
3. Fold the filter fabric flap around the bottom of the core and tuck between  
the entangled filaments and the Building Paper/WRB. This prevents insects  
from getting into the vent space.  
4. Place the second horizontal row of WallDrain with the fabric flap down,  
above the first row. The fabric flap will overlap the fabric of the first row.  
Flap may be tacked with a staple or construction adhesive if needed to  
hold in place.  
5. The upper row of WallDrain can be inverted so the fabric flap is up, to  
create an insect screen similar to the bottom. A separate piece of filter  
fabric or window screen can be used if it is not desirable to flip the upper  
row.  
6. For proper performance of the ventilation system WallDrain needs to vent  
at the top & bottom of the wall. The detail at the top of the wall should  
prevent wind driven rain from penetrating into the WallDrain layer.  
7. WallDrain should be attached with roofing nails, staples, or cap screws.  
Only use enough attachments to hold in place and prevent blow off, as it  
is desirable to have minimal penetrations through the WRB. Do not fasten  
through flashing.  
8. Attach woven wire, expanded metal, or coated fiberglass stucco reinforcement over the WallDrain according to manufacturer’s guidelines.  
9. Apply scratch coat layer and manufactured stone and/or thin brick  
according to manufacturer’s guidelines.

 

[![Enka Applications Chart. Which products works best for what!  ](https://no-cache.hubspot.com/cta/default/32796/751bf4b5-dcd3-4728-990e-1a05cdcf2274.png)](https://cta-redirect.hubspot.com/cta/redirect/32796/751bf4b5-dcd3-4728-990e-1a05cdcf2274)

 

## Enka WallDrain Brick Wall or Manufactured Stone Installation

![Enka WallDrain and 3D WallDrain on Wood Siding](https://www.globalplasticsheeting.com/hubfs/Enka%20WallDrain%20and%203D%20WallDrain%20on%20Wood%20Siding-jpg.jpeg)

 

1. Begin placing WallDrain at the bottom of the wall with the fabric flap  
down. Unroll WallDrain horizontally with entangled filaments touching the  
Building Paper/WRB with the filter fabric to the outside.  
2. The bottom edge of the WallDrain core should be aligned with the top  
of the weep screed. Weep screed should installed according to manufacturer’s guidelines.  
3. Fold the filter fabric flap around the bottom of the core and tuck between  
the entangled filaments and the Building Paper/WRB. This prevents insects  
from getting into the vent space.  
4. Place the second horizontal row of WallDrain with the fabric flap down,  
above the first row. The fabric flap will overlap the fabric of the first row.  
Flap may be tacked with a staple or construction adhesive if needed to  
hold in place.  
5. The upper row of WallDrain can be inverted so the fabric flap is up, to  
create an insect screen similar to the bottom. A separate piece of filter  
fabric or window screen can be used if it is not desirable to flip the upper  
row.  
6. For proper performance of the ventilation system WallDrain needs to vent  
at the top & bottom of the wall. The detail at the top of the wall should  
prevent wind driven rain from penetrating into the WallDrain layer.  
7. WallDrain should be attached with roofing nails, staples, or cap screws.  
Only use enough attachments to hold in place and prevent blow off, as it  
is desirable to have minimal penetrations through the WRB. Do not fasten  
through flashing.  
8. Attach woven wire, expanded metal, or coated fiberglass stucco reinforcement over the WallDrain according to manufacturer’s guidelines.  
9. Apply scratch coat layer and manufactured stone and/or thin brick  
according to manufacturer’s guidelines.

 

## **Wood Siding, Composite Wood Siding, Fiber Cement Siding, or Wood Shake Wall Installation **

1. Begin placing WallDrain at the bottom of the wall with the fabric flap  
down. Unroll WallDrain horizontally with entangled filaments touching  
the Building Paper/WRB with the filter fabric to the outside.  
2. Fold the filter fabric flap around the bottom of the core and tuck  
between the entangled filaments and the Building Paper/WRB. This  
prevents insects from getting into the vent space.  
3. Place the second horizontal row of WallDrain with the fabric flap down,  
above the first row. The fabric flap will overlap the fabric of the first row.  
Flap may be tacked with a staple or construction adhesive if needed to  
hold in place.  
4. The upper row of WallDrain can be inverted so the fabric flap is up to  
create an insect screen similar to the bottom. A separate piece of filter  
fabric or window screen can be used if it is not desirable to flip the  
upper row.  
5. For proper performance of the ventilation system WallDrain needs to vent  
at the top and bottom of the wall. The detail at the top of the wall should  
prevent wind driven rain from penetrating into the WallDrain layer.  
6. WallDrain should be attached with roofing nails, staples, or cap screws.  
Only use enough attachments to hold in place and prevent blow off,  
as it is desirable to have minimal penetrations through the WRB. Do not  
fasten through flashing.  
7. Install wood siding and shakes according to wood industry guidelines.  
Install Composite wood and Fiber Cement siding according to manufacturer’s guidelines. Fastener lengths should accommodate the thickness of  
the WallDrain. Pneumatic nailers can be used. Adjust depth gauge and  
pressure to prevent over nailing and compressing the WallDrain.

 

[![Tap For Pricing & Info (619) 448-4439](https://no-cache.hubspot.com/cta/default/32796/919f3d0d-5f01-4efc-b326-229bacaacbbf.png)](https://cta-redirect.hubspot.com/cta/redirect/32796/919f3d0d-5f01-4efc-b326-229bacaacbbf)![Resource page for Plastic Sheeting, Greenhouse Plastic, Fire Retardant Products, HDPE- LLDPE, Tapes  760 597 9298 Global plastic sheeting-jpg 2-jpg](https://www.globalplasticsheeting.com/hs-fs/hubfs/Resource%20Group/Resource%20page%20for%20Plastic%20Sheeting%2c%20Greenhouse%20Plastic%2c%20Fire%20Retardant%20Products%2c%20HDPE-%20LLDPE%2c%20Tapes%20%20760%20597%209298%20Global%20plastic%20sheeting-jpg%202-jpg.jpeg?width=786&height=309&name=Resource%20page%20for%20Plastic%20Sheeting%2c%20Greenhouse%20Plastic%2c%20Fire%20Retardant%20Products%2c%20HDPE-%20LLDPE%2c%20Tapes%20%20760%20597%209298%20Global%20plastic%20sheeting-jpg%202-jpg.jpeg)[![Plastic Sheeting tapes HDPE Enka Products  Thickness of plastic resource page](https://no-cache.hubspot.com/cta/default/32796/57740054-c888-48b6-bb00-53bf93947e4a.png)](https://cta-redirect.hubspot.com/cta/redirect/32796/57740054-c888-48b6-bb00-53bf93947e4a)

[![Home page www.globalplasticsheeting.com plastic sheeting, tapes, strapping fire retardant films greenhouse plastic](https://no-cache.hubspot.com/cta/default/32796/530a1ab4-9148-4247-8b4b-e63751c52184.png)](https://cta-redirect.hubspot.com/cta/redirect/32796/530a1ab4-9148-4247-8b4b-e63751c52184)   [![Search for Fire Retardant films, tapes, greenhouse plastic](https://no-cache.hubspot.com/cta/default/32796/5b9abe45-9e95-46a7-a36c-422a095c4829.png)](https://cta-redirect.hubspot.com/cta/redirect/32796/5b9abe45-9e95-46a7-a36c-422a095c4829)

 

 

### Enka WallDrain Questions?

- [Home](https://www.globalplasticsheeting.com/?hsLang=en-us) |
- [ Privacy Policy |](https://www.globalplasticsheeting.com/privacy-notice?hsLang=en-us)
- [Terms Of Service |](https://www.globalplasticsheeting.com/terms-of-service?hsLang=en-us)
- [ Who Are We?](https://www.globalplasticsheeting.com/who-are-we-/?hsLang=en-us) |
- [ Core Values](https://www.globalplasticsheeting.com/core-values-global-plastic-sheeting/?hsLang=en-us) |
-  
- [ Shipping | Returns](https://www.globalplasticsheeting.com/shipping-and-returns/?hsLang=en-us) | 
- [Videos of Products](https://www.globalplasticsheeting.com/videos-of-products/?hsLang=en-us) |
- [ SEARCH | ](https://www.globalplasticsheeting.com/search-for-plastic-sheeting-tapes-strapping?hsLang=en-us)GPS
- [ Line Card |](https://www.globalplasticsheeting.com/gps-line-card-plastic-sheeting/?hsLang=en-us)[ Contact](https://www.globalplasticsheeting.com/contact-us/?hsLang=en-us)

G3 Tapes, Inc.  (619)448-4439  
11639 Riverside Drive Suite 103 Lakeside CA 92040